Geoffs shelves
Geoff gets some shelves built into his office. Andrew and Gavin rip into Geoff for postponing an episode recording for shelving. After the shelves are built Geoff has to move his recording equipment and get a temporary setup while they’re painted. Geoff then has technical difficulties in his temporary setup because the shelf room needs so much more work.
First mention: S1. E23. TIME: 00:17:58 Episode link
Geoff explains his shelves and why he couldn’t record: S1. E25. TIME: 00:11:33 Episode link
Geoffs temporary recording setup while painting the shelves: S1. E27. TIME: 00:24:57 Episode link
Andrew and Gavin rip into Geoff again on moving a recording for shelves: S1. E28. TIME: 00:33:10 Episode link
Geoff having technical difficulties because the shelf room needs more work: S1. E30. TIME: 00:14:07 Episode link
Geoffs shelves are finished: S1. E34. TIME: 00:35:30 Episode link